The company has been specialized in water-supply building of steel and asbestos cement pipes since 1991.
We have been working exceptionally with PE pipes since 1998.
During the period from 1999 till this moment we have replaced the water-supply system in Rousse and its adjacent villages with total length of 4 500 m and the house water-supply diversions to them by our own efforts and resources.
The beginning was set with PE water-supply building ô90 mm for gas station Shell in town of Yambol, 400 m in length. Our company is investing in PE fittings production and in water-supply projects at the moment. We have implemented by our own efforts and resources two projects according to Water Loan Programme of the World bank. “Replacement of water-supply line along Borissova Str., Rousse” – it was replaced a section of 1400 m in length with PE pipes ô 315 mm and its adjacent house water-supply diversions to water meter unit – 187 pieces.“Replacement of water-supply line in village of Borissovo, Rousse region” -it was replaced a section of 600 m in length with PE pipes ô 225 mm and its adjacent house water-supply diversions to water meter unit.
In this project we have implemented and the mounting part of the following projects: “Replacement of water-supply line along Toutrakan BLVd., Rousse” – 1600 mm ô 315 mm as well as “Replacement of water-supply line along Pirotska Str., Rousse” – 400 m cast iron pipes were replaced with PE pipes ô 110.Velkompleks Ingenering has built the water-supply pipelines and sewerage of great number of gas stations OMV: OMV Vinogradets – 3600 m supplying PE water-supply line ô 140; OMV Charodeika – reconstruction wit PE water-supply line ô 250, 170 m in length; OMV Bus station ( Avtogara), OMV Mir, OMV Drujba, OMV Lyulin etc.